Skip to content

Add Nodes through BuildStreaM

Overview

Add nodes by updating the Orchestrator PXE mapping in the managed GitLab project and running the BuildStreaM deploy pipeline. A committed change to input/orchestrator/pxe_mapping_file.csv automatically selects the deploy pipeline. The child pipeline then requires an operator to select a BUILT image group and start deployment.

The mapping is uploaded to Orchestrator as the desired deployment input. Keep all nodes that must remain in the cluster in the file; the BuildStreaM source does not create a new-node-only inventory from the changed rows.

Prerequisites

  • Complete BuildStreaM deployment.
  • Ensure at least one image group has BUILT status. Run the build pipeline first if no built image group is available.
  • Ensure the new physical nodes are powered on and their BMC and admin addresses are reachable from the OIM.
  • Collect every value required by the source mapping header and use functional group names present in the selected catalog.

Procedure

  1. In the managed GitLab project, open input/orchestrator/pxe_mapping_file.csv, retain all existing rows, append the new node rows, and commit the change.

    input/orchestrator/pxe_mapping_file.csv
    FUNCTIONAL_GROUP_NAME,GROUP_NAME,SERVICE_TAG,PARENT_SERVICE_TAG,HOSTNAME,ADMIN_MAC,ADMIN_IP,BMC_MAC,BMC_IP,IB_NIC_NAME,IB_IP
    <catalog-functional-group>,grp1,79WWJ95,,new-node1,<admin-mac>,172.16.107.50,<bmc-mac>,172.17.107.50,,
    <catalog-functional-group>,grp1,79WWJ96,,new-node2,<admin-mac>,172.16.107.51,<bmc-mac>,172.17.107.51,,
    

    Replace the placeholders with values for the target hardware and a functional-group name present in the selected catalog.

  2. Open Build -> Pipelines. Confirm that the commit started the deploy parent pipeline.

  3. Open its downstream pipeline and run the manual selection job for the required BUILT image group.

  4. Run the manual deploy job. The child pipeline uploads the current Orchestrator inputs and then runs the deploy, restart, validate, and summary stages in sequence.

For the complete pipeline procedure, see Execute the deploy pipeline.

Verification

  1. Confirm that the downstream deploy, restart, validate, and summary jobs complete successfully.
  2. In the summary output, confirm the selected Job ID and Image Group ID and verify that the three operational stages report COMPLETED.
  3. Confirm that each added node is reachable on its admin IP and is registered in the intended Slurm or Kubernetes cluster.

Next steps

Troubleshooting

  • No deploy pipeline starts: Confirm the committed path is exactly input/orchestrator/pxe_mapping_file.csv.
  • No image-selection jobs appear: The deploy pipeline lists only image groups with BUILT status. Complete a build pipeline first.
  • An operational stage fails: Open its GitLab job log and use the BSM job log path reported for the failed stage.
  • See BuildStreaM troubleshooting for additional investigations.